Technical & Building Regulations


We turn your approved design into coordinated technical drawings — ready for Building Control, accurate pricing and a smooth build.

Building Regs package
Coordinated details
Ready to tender/build

Who it’s for

  • Homeowners with planning approval moving toward construction
  • Projects needing coordinated details for accurate pricing
  • Builds requiring Building Regulations approval and clear site info

You’ll walk away with

  • Technical GA plans, elevations & sections with key details
  • Notes/spec to meet Building Regulations (Part A–M as relevant)
  • Coordination with engineers/consultants and submission support

What happens in this stage


1) Detail

We develop construction drawings and key junction details.

2) Coordinate

We align with structural and specialist inputs to avoid clashes.

3) Approve

We prepare the Building Regulations package and support sign-off.

“Clear details and coordination save time on site — and money in the build.”

What you receive

  • Technical drawing set suitable for Building Control
  • Specification/notes addressing relevant Parts of the Regs
  • Coordination and submission support

Investment

From £1,950

No VAT is charged. Fee varies with scope, complexity and consultant inputs.


  • Technical drawings + details

  • Regs notes/specification

  • Coordination & submission support

FAQs

Do you liaise with Building Control?

Yes — we prepare and submit the package, and respond to queries.

Will you coordinate with the structural engineer?

Absolutely — we integrate structural input and other specialists where required.

Is this the same as construction drawings?

This package is focused on Building Control and accurate pricing. Contractor-specific details can follow in the next stage.


Ready for Building Control?
Prepare my regs package